Do I need a permit for Decks and/or Patios?

A deck and/or patio must be erected a minimum of 20 ft. from the rear yard line.  For side yard setbacks, please refer to the zoning requirements.  Deck permit submittals require a jacket, building permit, small construction and site survey.  The deck is to be drawn to scale on a survey no older than 20 years, showing dimensions and setbacks.  Footing, framing and stair plans are required.  A patio permit submittal requires a site work permit and site survey with the patio drawn to scale showing dimensions and setbacks.

* See: Sheds Fences Pools Patios Decks and Driveways handout Sheet (PDF) as stated above for detailed information. 

   

Show All Answers

1. Do I need a Permit for my shed?
2. Do I need a permit for fencing?
3. Do I need a permit for Decks and/or Patios?
4. Do I need a permit for my pool?